PART 2: PAST PROJECTS
(MECHANICAL CONTRACT AMOUNTS)



GUYTON RESEARCH BUILDING EXPANSION

University of Mississippi Medical Center, Jackson, MS
Plumbing and HVAC design for 175,000 sq. ft. research building. Built-up air handlers with heat reclaim system. Variable air volume system with integration to lab fume hoods. Five floors finished out and three floors shelled for future.

COST $10,400,000



CHILLER PLANT

University of Mississippi Medical Center, Phase I, Jackson, MS
Analyzed and redesigned pumping and piping in central chiller plant converting existing header system to primary/secondary piping/pumping system with variable speed pumps for 15,000 tons.

COST $2,500,000



2001 MECHANICAL RENOVATIONS, PHASE I

Mississippi Center for Education and Research, Jackson, MS
Design upgrade of piping and pumping for existing central chiller/boiler plant. New 1,000 ton chiller, cooling tower, primary/secondary variable speed pumps and new central plant energy management/control system.

COST $1,228,412



2004 MECHANICAL REPAIRS PROGRAM, PHASE II

Mississippi Center for Education and Research, Jackson, MS
New boiler, cooling tower, and related piping to upgrade central boiler/chiller plant.

COST $497,900



CHILLED WATER MODIFICATIONS

G.V. Sonny Montgomery Veteran Affairs Medical Center, Jackson, MS
Analyzed and redesigned pumping and piping in central chiller/boiler plant. New design with 3,080 tons of new chillers, cooling towers, D.D.C. controls, deaerators, steam piping, primary/secondary piping and variable speed pumping.

COST $5,800,000



MEDICAL GAS SYSTEM

G.V. Sonny Montgomery Veteran Affairs Medical Center, Jackson, MS
Designed and phased new medical gas system for existing operational Medical Center. System included piping outlets, zone valves, alarms, air compressors, vacuum pumps for O2, VAC, and air in rooms.

COST $680,000



SANITARY SEWER

G.V. Sonny Montgomery Veteran Affairs Medical Center, Jackson, MS
Designed and phased replacement of all sanitary sewer piping for existing operational medical facility.

COST $785,000



STATE VETERAN AFFAIRS NURSING HOME R & R

Jackson, MS
HVAC design to upgrade system with new chillers, air handling units, fan coil units and energy management system for 120 bed nursing home.

COST $713,853



NEW STATE VETERAN AFFAIRS NURSING HOMES (3)

COLLINS, OXFORD, KOSCIUSKO, MS
Design mechanical systems for new 120 bed nursing homes. Design included plumbing, medical gas, boilers, pumps, chillers, fan coil units, air handling units and energy management systems.

COLLINS COST $1,615,000
OXFORD COST $1,625,000
KOSCIUSKO COST $1,630,000



NEW RESIDENCE HALL COMPLEX, PHASE I

MISSISSIPPI State University, Starkville, MS
Design plumbing, HVAC and outside utilities for new 360 room dormitory.

COST $1,904,376



NEW RESIDENCE HALL COMPLEX, PHASE II

MISSISSIPPI State University, Starkville, MS
Design plumbing, HVAC and outside utilities.

COST $3,497,900



PHYSICAL EDUCATION AND ASSEMBLY BUILDING

MISSISSIPPI UNIVERSITY FOR WOMEN, COLUMBUS, MS
HVAC design for P.E. Building. HVAC system consists of chillers, boilers, air handling units for the gym and exercise rooms. Dehumidification units for swimming pool area.

COST $2,050,000



2001 CHILLER PLANT

Mississippi University for Women, Columbus, MS
Designed boiler and chiller plant with underground heating and cooling loop for 5 buildings. Chiller plant designed with free cooling feature.

COST $1,600,000



SANDERSON RECREATION CENTER

Mississippi State University, STARKVILLE, MS
Designed mechanical system for sports complex with 6 basketball courts, elevated walking track, large weight/exercise room, 2 aerobics rooms, climbing wall, 6 handball/racketball courts, office spaces and indoor swimming pool.

COST $2,950,000



CAMPUS WIDE COMPREHENSIVE ENERGY RENOVATION, PHASE 2 MECHANICAL

JACKSON STATE UNIVERSITY, Jackson, Ms
Design HVAC renovations to five story science lab and design campus wide energy management system for all buildings. Lab renovations included HVAC interface with lab hoods for VAV system.

COST $2,152,000



’95 MECHANICAL EXPANSIOn

Jackson State University, Jackson, Ms
Developed south chilled water loop connecting eight buildings to the central chiller system.

COST $1,681,105



CAMPUS CHILLED WATER LOOP, PHASE 2

Jackson State University, Jackson, Ms
South chilled water loop expansion. Expanded chiller plant and extended loop to connect to seven additional buildings.

COST $1,311,608



MECHANICAL EXPANSION, PHASE 3

Jackson State University, Jackson, Ms
North chilled water loop connecting ten buildings to central chiller plant.

COST $1,311,608



MECHANICAL EXPANSION, PHASE 4

JACKSON STATE UNIVERSITY, Jackson, Ms
Design new north central chiller plant with three 1,000 ton chillers, cooling towers, pumps, central plant energy management system.

COST $2,650,000



MASTER PLAN FOR MISSISSIPPI STATE UNIVERSITY CAMPUS WIDE UTILITIES

Mississippi State University, starkville, Ms
Energy analysis and cost estimates for furnishing and delivering steam, hot water and chilled water to each building on the Campus. Five different types of campus wide systems studied. Recommended converting existing steam plant into central chiller/boiler plant with chilled/hot water loop to supply campus buildings. Total of 9,000 tons and 3,000 boiler horsepower. Project to be done in five phases.

ESTIMATED COST $18,000,000



1989 UTILITIES PROGRAM, PHASE I

Mississippi State University, starkville, Ms
Design new steam, heating water and chilled water distribution system and central chilled/heating water plant for central core of 25 buildings on the campus. Central plant consists of steam to hot water converters, 1,250 ton chiller, pumps, cooling tower, etc.

CONTRACT $2,710,000
ACEC ENGINEERING EXCELLENCE AWARD



1991 CAMPUS UTILITIES, PHASE II

Mississippi State University, starkville, Ms
Design for extension of central campus heating water and chilled water loop. Connections to five buildings.

CONTRACT $900,000



CHILLED WATER LOOP

Mississippi Valley State University, itta bena, ms
Design new chiller plant and chilled water distribution loop to supply cooling water to existing and new buildings on campus, two (2) 1,250 ton chillers, pumps, and cooling towers. This phase included air conditioning for six dorms using new chilled water loop. There are four phases to this project.

COST $5,160,000



SCIENCE AND TECHNOLOGY BUILDING

Mississippi Valley State University, itta bena, ms
Design mechanical system for teaching/research building. Special considerations for research labs pressurization, fume hood exhaust, and special Vivarium HVAC systems connected to central chilled water loop.

ESTIMATED COST $2,650,000



RENOVATION OF KITCHEN AND CAFETERIA

Mississippi Valley State University, itta bena, ms
Design new HVAC, plumbing, and electrical systems for existing kitchen and cafeteria. New HVAC system connected to central chilled water loop.

COST $970,000



FIELDING WRIGHT MATH & SCIENCE BUILDING

Mississippi Valley State University, itta bena, ms
Design new HVAC, hood exhaust and plumbing systems for existing Science Lab Building. New HVAC system connected to central chilled water loop.

COST $928,000



STUDENT UNION

Mississippi Valley State University, itta bena, ms
Design new HVAC and plumbing system for Student Union and Grille. New HVAC system connected to central chilled water loop.

COST $760,000



FIRST PRESBYTERIAN CHURCH

JACKSON, MS
HVAC and plumbing design for renovation and addition to existing church. New chiller, boiler, pumps, air handling units, and duct.

COST $900,000



MADISON COUNTY COURTHOUSE, PHASE I

Canton, MS
Design of HVAC and plumbing systems for renovations and additions of two story county office and courts building. Chilled and hot water, variable air volume system with energy management system.

CONTRACT $400,000



MADISON COUNTY COURTHOUSE, PHASE II

Canton, MS
Design of HVAC and plumbing systems for new two story county office and courts building. Chilled and hot water, fan coil system with energy management system.

CONTRACT $345,600



MADISON COUNTY COURTHOUSE, PHASE III

Canton, MS
Design of HVAC and plumbing systems for renovations and additions of three story county office and courts building. Chilled and hot water, fan coil systems with energy management system.

CONTRACT $160,000



SILVER STAR CASINO, PHASE I

Philadelphia, MS
Design of HVAC and plumbing systems for 120,000 sq. ft. casino and 500 room hotel.

Contract $4,600,000



Silver Star Casino, Phase III

Philadelphia, MS
Designed mechanical systems for casino addition and additional 300 rooms to hotel. Chiller plant was designed to supply cooling to fan coil units in rooms, air handling units in casino and to make-up air units.

COST $6,550,000



Hollywood Casino

Tunica, MS
Design of HVAC and plumbing systems for 100,000 square foot casino.

CONTRACT $3,270,000



Fitzgeralds’s Casino

Tunica, MS
Design of HVAC and plumbing systems for 80,000 square foot casino and 400 room hotel

CONTRACT $3,900,000



Fitzgeralds’s Casino, Phase II

Tunica, MS
Designed mechanical system for 500 room hotel, kitchen, restaurant and gaming floor.

COST $3,400,000



Rainbow Casino

Vicksburg, MS
Design of HVAC and plumbing systems for 60,000 square foot casino.

CONTRACT $1,120,000



Jackson City Schools

Jackson, MS
Design of new heating and air conditioning systems for existing school, cafeteria, kitchen, and auditorium. Design included energy management system and interface with central computer system.

(1) Baker Elementary School CONTRACT $722,300
(2) Dawson Elementary School CONTRACT $768,000
(3) Power/APAC Center CONTRACT $248,427
(4) Raines Elementary School CONTRACT $309,572
(5) Walton Elementary School CONTRACT $404,000



Pearl River Elementary School

Choctaw Indian Reservation, Neshoba County, MS
Designed HVAC and plumbing systems for new school consisting of classrooms, offices, library, kitchen, gym and band room. Central energy management system for this complex and two future campuses.

CONTRACT $927,000



Pearl River High School

Choctaw Indian Reservation, Neshoba County, MS
Design of HVAC and plumbing systems for renovation and additions to high school. Project includes new library, classrooms, administration area and new auditorium. Interface with existing energy management system.

CONTRACT $594,000



Tucker Elementary School

Choctaw Indians Reservation, Neshoba County, MS
Designed HVAC and plumbing systems for new school consisting of classrooms, offices, library, kitchen, gym and band room. Central energy management system for this complex.

CONTRACT $799,000



Mississippi State University Vet School

Mississippi State University, starkville, Ms
Energy management system and air handling unit modifications.

COST $275,000



2000 Wise Center Renovations

Mississippi State Veterinary MedicaL School, starkville, Ms
Analyzed and redesigned chiller plant with primary/secondary variable speed pumping and piping. Three 600 ton chillers, cooling tower, pumps and central plant energy management and controls. Designed FREE COOLING cycle using cooling towers.

COST $1,019,080



Packard Electric, Phase I

Brookhaven, MS
Analysis and design of chilled water (120 ton) and process water for new precision molding module. After analysis of the existing HVAC system, an additional 75 tons of air conditioning was designed for space cooling of this module.

COST $375,000



Packard Electric, Phase II

Brookhaven, MS
Analysis and design on new chilled and process water, compressed air system and space air conditioning for second precision molding module.

COST $650,000



Packard Electric, Phase I

Clinton, MS
Analysis and design of gas distribution system for manufacturing facility of 800,000 sq. ft. Network of over 6,000 feet of pipe and valves for high pressure distribution to future equipment.

CONTRACT $148,000



Packard Electric, Phase II

Clinton, MS
Analysis and design of gas distribution system for manufacturing facility of 750,000 sq. ft. Network of over 4,800 feet of pipe and valves for high pressure distribution to future equipment.

CONTRACT $130,000



BOILER PLANT

SANDERSON FARMS, COLLINS, MS
Design of 3,000 boiler horsepower plant to serve poultry rendering and process plant. Steam system operating at 125 psi with high pressure condensate return.

CONTRACT $130,000



Hunter Engineering

Union, MS
Design of HVAC, plumbing, make-up air and exhaust of paint and welding booths, and hazardous waste piping systems for 125,000 square foot manufacturing plant.

CONTRACT $574,000



HUNTER ENGINEERING

Raymond, MS
Analysis and design of new HVAC system for existing 90,000 square foot plant.

CONTRACT $459,000



Armstrong

Jackson, MS
Design of make-up air, heating and exhaust system for 36,000 square feet. Design of make-up air and exhaust for 600 square foot battery charging area.

CONTRACT $96,000



Fishco, Inc.

Belzoni, MS
Designed HVAC systems, compressed air and vacuum systems, high pressure wash down system, and sewer systems for new catfish processing plant.

COST $285,000



United Technologies

Columbus, MS
Analysis and redesign of existing chiller plant (1,750 tons), pumps (primary and secondary), cooling tower (by-pass), and piping. Heat gain/loss calculations on 105,000 sq. ft. manufacturing facility with new duct lay-outs, air handlers, and chilled pipe water system.

CONTRACT $803,000





If you would like to learn more about our services download our qualifications brochure.

To contact us by email click here.